Here's an update for those of you who are interested. I don't have pictures yet, but you'll forgive me for that, right? :)
The framing for the bedroom and bathroom is complete. I need to add another small bit of framing for the landing at the bottom of the stairs so that there will be an edge for the carpeting.
The plumbing supply lines have been run to the bathroom space complete with a pair of Master cutoffs for that bathroom.
The electrical work is nearly complete, just need to hook up a few lights and get an electrician to wire the outlet circuit into the electrical panel and check over the wiring.
I need to do the insulation once my part of the wiring is complete.
After that, there's the doors, the drywall, mudding and taping, finish carpentry, and then painting. All this needs to be complete by the last week of April.
I'll try to get pictures posted soon.
This post was brought to you by the letters S, T, U, D, and the number 100.