It is frakking COLD! The boiler at work broke at some point over the weekend and I could see my breath when I walked into my office this morning. It's only marginally better at this point, but typing is a real challenge. Unfortunately for me, I have craptacular circulation in my hands and toes so they'll be cold for the next week or so.
I've been in my fleece and coat all day in an effort to fight off the insanity, but I'm not really sure how well I'm doing in this fight. This is probably a bad sign, but such is life, eh? :)
On to other things, I have enough materials (once I get a bucket of nails and a small shopvac) to start work in the basement of our house now. Of course it still isn't cleared out, but there are a few more items I can do before I start the framing. I have to relocate/reconfigure a few pipes, run a heating duct into the bedroom and add a cold air return to the space in the basement all of which can be done before the framing starts.
Wish me luck! I'll take pictures and post them. :)
This post was brought to you by the letters S, B, Y, E, and the number 3.
Monday, January 12, 2009
Fingers?, Toes? What are those things?
Subscribe to:
Post Comments (Atom)
1 more ramblings:
Good luck! Wish I could help you in the basement!
Post a Comment